top of page
hg2775

Big milestone: 4 containers machinery installed! Aeolos interior production can start.

Yes, it´s done. In Factory 2.7 the carpentry with 14 machines, and the CNC carpentry center are connected to electricity. In the factory 2.8 the super strong Zimmermann milling machine is mounted. The new 15m paintbooth is almost installed.

We already started production on the new machines, but in between we build the housings, adding AC, creating tool cabinets, installing exhaust systems, training staff, and a lot more. On these machines we produce high quality and super light interior part for yachts and architecture projects. We combine composite materials with wood, marble or textiles. For that we are using glueing machines, a heated press, veneer stitching, edge banding and some more dedicated technology for high end carpentry products.

Everything is related to marine standards: PU glue, Epoxy glue, water proof materials (Marine plywood and composite sandwich).


With the whole setup we are implementing the 5S methodology, to improve productivity, safety, and quality by creating an organized and visually controlled work environment. Each of the 5S principles represents a specific step in the process: Sort, Straighten, Shine, Standardize, and Sustain.

Part of the 5S strategy: Easy to access wood and composite panel storage.

All tools at the machines.



145 views0 comments

Comments


bottom of page